Kapal keur diobral sarupa jeung Tukang keruk
![]() |
PONTOON FOR EXCAVATOR / DREDGING / CONSTRUCTION WORKS, LOA 14.64m, 2003 Tukang keruk - Draf kapal 0.42m €175,000 |
Total kapanggih: 1
![]() |
PONTOON FOR EXCAVATOR / DREDGING / CONSTRUCTION WORKS, LOA 14.64m, 2003 Tukang keruk - Draf kapal 0.42m €175,000 |